News comments

Metalloinvest | 26 декабря 2018 г. | 12:35

Category Metalloinvest upgrades blast furnaces at Ural Steel

 Category Metalloinvest upgrades blast furnaces at Ural Steel

Metalloinvest has commenced the technical re-equipping of blast furnaces #2 and #3 at Ural Steel.

In order to be able to function with maximum efficiency for an extended period of time, the blast furnaces will be equipped with a cooling and lining system using high-heat copper cooling plates combined with graphite refractories.

The modernisation also involves the installation of a new automated control system ...

Read news



Комментарии могут оставлять только зарегистрированные (авторизованные) пользователи сайта.