MMK | 21 March 2007 г. | 10:47

An average repair of a boiler have begun at MMK

An average repair of a boiler  have begun at MMK
An average repair of a boiler unit «Babkok-Vilkoks» # 4 of boiler sites # 2 of steam boiler power station have begun at MMK.

The repair will take 25 days. Electrorepair of MMK, JSC acts as the contractor.

The steam boiler power station is designed to blow blast furnaces with steam and air and ensure thermal and electrical energy supplies to the plants of the enterprise.

Source: Metal Supply and Sales
View count: 118

Комментарии могут оставлять только зарегистрированные (авторизованные) пользователи сайта.